Townhomes townhouses for sale
St. Francis Heights, Mastersons Avenue, Upper Carmen, Cagayan de Oro City, Philippines
Townhomes townhouses at St. Francis Heights, the first residential enclave in a 25-hectare mixed-use community which will also be composed of hotel, condotel, leisure facilities, commercial and BPO centers in the near future. St. Francis Heights will be the first town homes-residential offering in PonteFino Estates Cagayan de Oro, the initial project of Fino Land, Inc.
Scroll down for more details below.
UNITS OFFERED : Corner unit townhomes • Mid unit townhomes
CLICK OR TAP IMAGES TO ENLARGE
Learn more about this property.
Typical Corner Unit
Typical Mid Unit
Ground floor
Living Room
Dining Room
Kitchen
Toilet and Bath
Maid's room
Carport (2-car garage)
Total Lot Area:
Total Floor Area:
Second Floor
Master's Bedroom
Master's Toilet and Bath
Bedroom 1
Bedroom 2
Common Toilet and Bath
Hallway
99 sq. meter
103.15 sq. meter
Ground floor
Living Room
Dining Room
Kitchen
Toilet and Bath
Maid's room
Carport (2-car garage)
Total Lot Area:
Total Floor Area:
Second Floor
Master's Bedroom
Master's Toilet and Bath
Bedroom 1
Bedroom 2
Common Toilet and Bath
Hallway
72.50 sq. meter
98.2 sq. meter
FEATURES : 305 Uniquely-designed Units • Wide & Well-lit Paved Roads • Garbage Collection • Entrance Gate • 24/7 Security • Located in a definitely flood-free Uptown CDO area
AMENITIES : Clubhouse • Basketball Court • Adults & Kids' Swimming Pool • Parks & Playground • Meeting Room • Multi-purpose Room
SPECIFICATIONS AND FINISHES
Ground Floor Flooring:
Second floor Flooring:
Bathroom Tiles:
Stairs:
Roofing:
Ceiling:
Main Door:
Interior Doors and Jambs:
Windows:
Electrical:
Pumbing Fixtures:
Ceramics Tiles
Wood Grains Vinyl tiles
Ceramic Tiles
Wooden Steps
Asphalt Shingle Roofing
Gypsum on Metal Furring
Solid Panel Wood
Flush Doors
UPVC Windows / No Screens
CATV & Telephone Line Provisions
Lighting Fixtures not included
New Titan Jr HCG Package of equivalent
Fusion Welded PPR Pipes
DEVELOPER : Fino Land, Inc.
HLURB LTS No. : 031753
APPROVED COMPLETION DATE: June 2022